2 modular dorms - 80 cabins each

Assembly is over, time to clean the territory
Assembly is over, time to clean the territory
Benches are mounted in front of the dorms
Benches are mounted in front of the dorms
The cabins are mounted onto the strip foundation
The cabins are mounted onto the strip foundation
Even the territory is cleaned and the flowerbeds are arranged
Even the territory is cleaned and the flowerbeds are arranged
 Assembling the canopy over the outdoor staircase
Assembling the canopy over the outdoor staircase
The building is assembled, only the covering flat strips are missing
The building is assembled, only the covering flat strips are missing
Finishing the interior works
Finishing the interior works
The guyes are finishing the roofing and mounting the canopy above the stairs
The guyes are finishing the roofing and mounting the canopy above the stairs
The workers are habitating the place actively
The workers are habitating the place actively
A bathroom with sinks
A bathroom with sinks
The corridor of the second floor
The corridor of the second floor
Beautiful place - the Moscow river is nearby
Beautiful place - the Moscow river is nearby
The building exterior is very presentable and tidy
The building exterior is very presentable and tidy
Everything is ready for active works on the construction site
Everything is ready for active works on the construction site
Interior of the shower and the toilet
Interior of the shower and the toilet
Showers are simple, but functional
Showers are simple, but functional
Workers will soon appreciate the benefits of the canopy above the staircase
Workers will soon appreciate the benefits of the canopy above the staircase
See the air vents in the bathrooms - we are very attentive to every details
See the air vents in the bathrooms - we are very attentive to every details
Another washroom
Another washroom
And this is the drainage, septic tanks are installed further
And this is the drainage, septic tanks are installed further
  • Assembly is over, time to clean the territory
  • Benches are mounted in front of the dorms
  • The cabins are mounted onto the strip foundation
  • Even the territory is cleaned and the flowerbeds are arranged
  •  Assembling the canopy over the outdoor staircase
  • The building is assembled, only the covering flat strips are missing
  • Finishing the interior works
  • The guyes are finishing the roofing and mounting the canopy above the stairs
  • The workers are habitating the place actively
  • A bathroom with sinks
  • The corridor of the second floor
  • Beautiful place - the Moscow river is nearby
  • The building exterior is very presentable and tidy
  • Everything is ready for active works on the construction site
  • Interior of the shower and the toilet
  • Showers are simple, but functional
  • Workers will soon appreciate the benefits of the canopy above the staircase
  • See the air vents in the bathrooms - we are very attentive to every details
  • Another washroom
  • And this is the drainage, septic tanks are installed further

Related links

On map