Krimsk

Completed project
A fully assembled object
A fully assembled object
The installed construction site office building
The installed construction site office building
A fully assembled object
A fully assembled object
Mounted construction site office buildings
Mounted construction site office buildings
Mounted construction site office buildings
Mounted construction site office buildings
Mounted construction site office buildings
Mounted construction site office buildings
The dining room
The dining room
The dining room
The dining room
A working room
A working room
The heater and ventilation in the bathroom
The heater and ventilation in the bathroom
A staircase with wooden steps and handrails of a circular tube
A staircase with wooden steps and handrails of a circular tube
The construction site office entrance
The construction site office entrance
The entrance area with a canopy and railings
The entrance area with a canopy and railings
A working room
A working room
A small meeting room
A small meeting room
A small meeting room
A small meeting room
The second floor indoor ladder
The second floor indoor ladder
A large meeting room
A large meeting room
A large meeting room
A large meeting room
A large meeting room
A large meeting room
  • A fully assembled object
  • The installed construction site office building
  • A fully assembled object
  • Mounted construction site office buildings
  • Mounted construction site office buildings
  • Mounted construction site office buildings
  • The dining room
  • The dining room
  • A working room
  • The heater and ventilation in the bathroom
  • A staircase with wooden steps and handrails of a circular tube
  • The construction site office entrance
  • The entrance area with a canopy and railings
  • A working room
  • A small meeting room
  • A small meeting room
  • The second floor indoor ladder
  • A large meeting room
  • A large meeting room
  • A large meeting room
Assembly process
The building installation process
The building installation process
The installation process of the building interior elements
The installation process of the building interior elements
The final stage of the second floor units mounting and the roof assembly
The final stage of the second floor units mounting and the roof assembly
A future meeting room
A future meeting room
A future meeting room
A future meeting room
Columns at the meeting room
Columns at the meeting room
A cabinet
A cabinet
Installation of the roof trusses
Installation of the roof trusses
Diesels
Diesels
The abutment area is not yet developed
The abutment area is not yet developed
Finishing materials
Finishing materials
Wall sandwich panels
Wall sandwich panels
The final stage of the building assembly
The final stage of the building assembly
Sealing construction joints
Sealing construction joints
  • The building installation process
  • The installation process of the building interior elements
  • The final stage of the second floor units mounting and the roof assembly
  • A future meeting room
  • A future meeting room
  • Columns at the meeting room
  • A cabinet
  • Installation of the roof trusses
  • Diesels
  • The abutment area is not yet developed
  • Finishing materials
  • Wall sandwich panels
  • The final stage of the building assembly
  • Sealing construction joints
Manufacturing
Ready to ship transpacks
Ready to ship transpacks
Transport packages at the workshop
Transport packages at the workshop
Transport packages at the workshop
Transport packages at the workshop
Roof trusses
Roof trusses
Roof trusses
Roof trusses
Steel roof elements
Steel roof elements
Transpacks loading
Transpacks loading
Transpacks loading
Transpacks loading
  • Ready to ship transpacks
  • Transport packages at the workshop
  • Transport packages at the workshop
  • Roof trusses
  • Roof trusses
  • Steel roof elements
  • Transpacks loading
  • Transpacks loading

Related links

On map