Modular laboratory for concrete tests

Completed project
General view of the building
General view of the building
The building is equipped with an external fire escape straicase
The building is equipped with an external fire escape straicase
The side facade
The side facade
The building with communications
The building with communications
In addition to the laboratory two checkposts buildings were supplied
In addition to the laboratory two checkposts buildings were supplied
General view of the concrete production complex
General view of the concrete production complex
Another panorama of the object
Another panorama of the object
A central entrance
A central entrance
A checkpoint
A checkpoint
  • General view of the building
  • The building is equipped with an external fire escape straicase
  • The side facade
  • The building with communications
  • In addition to the laboratory two checkposts buildings were supplied
  • General view of the concrete production complex
  • Another panorama of the object
  • A central entrance
  • A checkpoint
Interior
A laboratory unit for testing
A laboratory unit for testing
The test rig is mounted on a separate foundation
The test rig is mounted on a separate foundation
The staff cabinet
The staff cabinet
The staff cabinet
The staff cabinet
The meeting room
The meeting room
The cabinet of the head of the lab
The cabinet of the head of the lab
The secretary cabinet
The secretary cabinet
The indoor stairs
The indoor stairs
  • A laboratory unit for testing
  • The test rig is mounted on a separate foundation
  • The staff cabinet
  • The staff cabinet
  • The meeting room
  • The cabinet of the head of the lab
  • The secretary cabinet
  • The indoor stairs
Assembly process
The process of the roof installation
The process of the roof installation
Finishing the building assembly
Finishing the building assembly
It remains to mount the roof and install doors and battens
It remains to mount the roof and install doors and battens
The lab building was set on concrete blocks
The lab building was set on concrete blocks
The roof is made of triangular trusses and rectangular tubes connections
The roof is made of triangular trusses and rectangular tubes connections
This is a typical roof for the building of such width
This is a typical roof for the building of such width
Finishing of the second floor premises
Finishing of the second floor premises
All done - only battens remaining
All done - only battens remaining
The process of internal stairs installation
The process of internal stairs installation
The second floor entrance
The second floor entrance
  • The process of the roof installation
  • Finishing the building assembly
  • It remains to mount the roof and install doors and battens
  • The lab building was set on concrete blocks
  • The roof is made of triangular trusses and rectangular tubes connections
  • This is a typical roof for the building of such width
  • Finishing of the second floor premises
  • All done - only battens remaining
  • The process of internal stairs installation
  • The second floor entrance

Related links

On map