ICS company modular office

Installing the garage
Installing the garage
Assemblying the garage roof
Assemblying the garage roof
The external evacuation staircase was also installed
The external evacuation staircase was also installed
The garage is already assembled, the installation of stained-glass window has started
The garage is already assembled, the installation of stained-glass window has started
The battens installation process
The battens installation process
The facade covered with battens
The facade covered with battens
An entrance group
An entrance group
A cabinet at the 2nd floor
A cabinet at the 2nd floor
A cabinet at the 2nd floor
A cabinet at the 2nd floor
The room on the first floor of the modular building
The room on the first floor of the modular building
The internal staircase
The internal staircase
A stained-glass window at the second floor
A stained-glass window at the second floor
  • Installing the garage
  • Assemblying the garage roof
  • The external evacuation staircase was also installed
  • The garage is already assembled, the installation of stained-glass window has started
  • The battens installation process
  • The facade covered with battens
  • An entrance group
  • A cabinet at the 2nd floor
  • A cabinet at the 2nd floor
  • The room on the first floor of the modular building
  • The internal staircase
  • A stained-glass window at the second floor

Related links

On map